top of page

ABOUT US

 

FUTURE:

yesil-bina-enerji-tasarrufu-ve-verimlili
Our Aim & Goals

New Headquarters: 

 

We have an ambitious goal: to have one of the world’s greenest office building. The £62 million project aims to be the first mixed-use office building in the UK to meet the Living Building Challenge standards, which includes net-zero levels of electricity and water usage. To do that, the building will be blanketed with photovoltaic cells for collecting energy. It’ll have an underground tank that collects water and a geothermal well system that heats the building during winter and cools it during summer. Finally, the building will be toxin-free, built with locally sourced materials, this will help our goal of helping the UK economy grow.

 

New Plane Hangers: 

 

The unique design of Hangar 4 is evidenced by the implementation of an eco-friendly concept. This eco-friendly building concept is Lion Air's responsibility to the earth. This concept is contained in the special construction of the Hangar, such as skylights on the roof and Panasas Glass on the walls of the Hangar to help optimize natural sunlight, the second floor's (office), has a curtain wall with laminated glass to maximize light circulation for a modern and transparent look, aluminium ceilings minimize air turbulence, while the roof has been designed to allow water to drain easily and therefore reduce the impact on the facade. Hangar 4 uses Metal Halide lamps to create white light and low electricity consumption. The facility has the maintenance capacity of up to 16 narrow body aircraft, including one bay for aircraft painting. We are planning on rebuilding hanger 1, 2 and 3 to help reach our eco-friendly goals by the end of the year (2018).

  • Grey Twitter Icon
  • Grey Instagram Icon

Lion Air Plc.
Waterside
PO Box 365
Harmondsworth, UB7 0GB
United Kingdom

© 2018 by Lion Air Plc.

Join Our Mailing List

For Updates & Special Offers

bottom of page